A workplace under the Fire Safety Order before practical completion.
Sites, refurbishments and fit-outs. The duty to assess does not wait for the building to be finished, and neither does the risk.
The premises we assess in this sector
What makes construction different to assess
Welding, cutting and grinding in a building full of combustibles. A permit system is only as good as the enforcement behind it.
Routes that change weekly, and signage that does not change with them.
Protection arrives late in the programme. Until it does, a fire has the whole building.
Battery and wireless systems, often the first thing moved and the last thing checked.
Packaging and offcuts accumulate faster than they are cleared, and usually against a wall.
Duties overlap, and the boundary matters most in an occupied building under works.
Reassessed as the site changes, not once at the start.
A construction site is a different building every few weeks. An assessment written at mobilisation describes a site that no longer exists by the first fix, which is why we set review points against the programme rather than against the calendar.
Where works are inside an occupied building, the assessment covers both — the site and the people still using the rest of the premises. Those are not separable.
Two answers that decide most of the others
What is burning and how people leave between them settle where detection goes, which doors matter most, and whether the escape route can carry a full building at once.
Unusually high and unusually exposed. Timber, packaging, insulation and waste, often without the compartmentation that would eventually contain any of it, and with ignition sources brought in deliberately.
Timber frame is the clearest case: a period during the build when the structure itself is the fire load.
Simultaneous, from routes that change as the programme moves, by a workforce that changes as often — with agency and subcontract staff who may be on site for the first time that morning.
Induction is doing the work that signage and familiarity do everywhere else.
Fire risk is not the same from one sector to another. Each page describes what changes.
Completed industrial and logistics premises.
Works to civic and heritage buildings.
Blocks undergoing refurbishment.
Tell us about the premises
A few questions decide what else we need to ask, so you only answer what applies. We provide a quote against the building you have described — not a range, and no call needed before the quote.
Reports follow within a week of the visit, sooner wherever we can, and a 48-hour service is available when you need it faster.
Already have an assessment?
Tell us when the last one was done and we will remind you before it is due for review. No quote needed — and fire doors too, if you want reminding about those.
A few details and a date. Under a minute, and nothing else happens unless you ask it to.